Enter Your Typical Workflow Parameters

Allowed Range

Parts cut per day:

1 - 100, rounded up to nearest 5

Cuts per part (including end cuts):

2 - 100

Scrapped parts (%):

0 - 100

Jobs per month:

1 minimum

Spools per month:

1 minimum

Randoms used per month:

1 minimum

Average length of pipe (ft):

15 - 100

Average cost per foot of pipe ($):

1 - 500

Average burdened hourly wage ($):

10 - 200

Time to create one cut-ready spool-sheet (min):

1 - 60

Time to program one part at the machine (min):

1 - 60

Time to nest parts per pipe random (min):

1 - 60

Time to re-make a scrapped part (min):

1 - 60

Time per cut to grind & fill for fit-up (min):

1 - 60

Time to find spool for on-site install (min):

1 - 60

Time to update job status (min):

1 - 60

Annual Savings

Yearly labor costs without PypeServer Enterprise:

Yearly labor costs with PypeServer Enterprise:

Yearly labor savings:

Yearly pipe savings:

Total yearly savings:

Because shops have busy and slow times, the graph below uses your inputs

to show how annual savings varies with the number of parts cut per day.